Trail Center Logo

Trail Center

Volunteer

Events

News

Maps


Trail Center
  Information
  Mission
  Newsletter
  Who We Are
  Services
  Membership

Volunteer
  Calendar & Activities
  Trail Building
  FAQ

Current Projects
  Mt. Ellen Trails
  Bear Gulch Trail
  Bay Area Ridge Trail
  Annual Tool Party
  South Rim Trail

Maps & Publications

Photo Gallery

Credits

Contact Us
  info@trailcenter.org

Volunteer
  volunteer@trailcenter.org

Facebook button

Follow the Trail Center on Twitter

RSS Button

Wunderlich County Park

Wunderlich Park, a hillside area of redwood forest, open meadows, and beautiful oaks and madrones, this area was once the ranch of the Folger family and was donated to the County by Martin Wunderlich. The park is largely open space, with a system of beautiful trails. Both, riding and hiking are available.

Location: Wunderlich County Park, Woodside, California - Bear Gulch Trail

Directions: 4040 Woodside Road, Woodside 94062 - (650)851-1210

- From the North
Turn off at the Woodside Road (Highway 84) exit. Turn westbound (towards Woodside). Proceed approximately 3 miles through the Town of Woodside. The main park entrance will be on the west (right) side of the roadway. The entrance sign is wooden and next to a yellow emergency phone box. Pay attention to your speed in Woodside or you'll be involuntarily contributing to the General Fund.

- From the South
Take the 280 Sand Hill exit west. Go on past the Whisky Hill intersection, up and over a small hill, and turn right onto Portola Road just after passing the gate to Jasper Ridge preserve. Bear left at the Y, staying on Portola. Portola will T into 84 (Woodside Road), turn right on 84. After half a mile or so watch for the Wunderlich entrance on the left. (Clearly signed; don't be fooled by an entrance to a private stable area.)

Agency: San Mateo County Parks - Carla Schoof, San Mateo Volunteer Coordinator

Supervisor: Hank Magnuski

Project Lead: Hank Magnuski

Additional Information: Participants should bring water, sunscreen, sturdy shoes, lunch and normal precautions against poison oak exposure (work gloves, long sleeved shirts and long pants). The Trail Center provides tools, training, gloves, and refreshments after the workday.

Saturday, October 08, 2016 - Bear Gulch Trail

Activities: We will be surveying trails in this park due to reports of needed work.

Please check this website for updates on our activities for this date.
Volunteer

Copyright © Trail Center. All rights reserved.

Please contact the Web Manager for corrections or comments. Updated 28 Aug 2016

    decoration decoration decoration decoration decoration